U.S. Embassy Ta ‘Qali malta

TelTec Electrical Ltd had originally been invited on this project to assist with electrical problems throughout the entire site. This soon expanded to becoming the major electrical contractor over the complete electrical installation.

Teltec's scope of works was to turn around the contracts electrical deficiencies in every department to include; Reporting, Coordination, Health & Safety, Material takes off's, Supervision, Labour supply, Installation of containment, Wiring, Termination, Testing, BAS systems, Security cameras, Pump controls, Distribution, Isolation, General lighting and power, Grounding, Telecoms, Commissioning and thermal image testing.


Teltec
successfully managed in a short space of time to bring the project forward for a substantial completion acceptance.

The New Embassy Compound for the US State Department was a complicated high security project that had many difficult construction issues to overcome. Teltec Electrical conducted an overseas operation to assist the construction company AICI - Special Projects in every way possible to minimise further delays.

By arranging security clearances, flights, accommodation, transport and documentation, Teltec proved itself to be more than capable of self supervising and managing a project of this magnitude in a difficult international environment.

Teltec Electrical Ltd with trained and competent staff brough a positive "Can do" attitude to the project, working in conjunction with other trades to expedite the contract in the interest of the client.